Today we were able to present our progress to our project. Both Dr. Furman and Ron was able to provide us with helpful feedback. After, we noticed that the wheels were not aligned. Once adjusting them and determining which wheels were pairs (in total there were four wheels at our disposal and one pair was slightly larger than the other), we placed a metal sheet under the 2x4 blocks so that the handle may slide and not scrape against the board. Lastly, due to lack of welding equipment we used JB weld paste to attach two unistruts back to back. This was done for the fixed and sliding base.