February 6, 2019 - Organizing and New Location
On the 6th of February, the team focused on organizing our new workplace on Terraine St. This came after the whole team helped Spartan Superway move from the old warehouse location. About 3/4 of our parts were stored in a room and we spent our time hauling the old material to our workplace. We realized, however, that some of our parts were missing and still are. We assume that they were taken in for scrap metal so we plan to re-fabricate those parts.
Apart from cleaning up the workplace, the team spent their time on two things. Brandon and I went ahead and laid out the track on the floor so we could get the general sense of the space it would be taken. Second, the team had to re-design the track bender since there were resources that were previously available to us before that aren't now.
For the following week, we plan on continuing to improve the track bender design and to work on rebuilding the previous track. We also hope to have outside access to the location besides on Wednesday meetings.
Comments
Post a Comment